Water World Tank Rehabilitation
Dothan, AL | Dothan Utilities

Poly, Inc. served as the lead design engineer for the rehabilitation of Westgate Tank at Water World.  Work completed included pressure washing the exterior, painting the tank bowl and roof, and creating artwork for the Water World logo, including painting three logos. The team also designed the electrical system for LED lighting for the tank columns, center pillar, and bowl. Poly was able to design the project, administer the bids, and manage the construction to complete the project within the tight schedule, ensuring that the tank was ready for use before Christmas. The lighting system installed for this tank is programmable, allowing for the rapid changing of light schemes that can be synchronized with music!

 

Total Construction Cost: $1,300,000